Deepings School

Full Installation of Plant Room

In the early part of 2015, P J Services were commissioned by Balfour Beatty to carry out the full design and installation of mechanical services at the new build Science Block at The Deepings School. This work encompassed heating, ventilation, domestic services, gas conveyance and air conditioning.

Work was carried out within an extremely narrow time frame and there was great expectation on PJs to deliver. We worked very closely with Balfours and the rest of the design team throughout the contract period , communicating effectively on a multi disciplinary level.

Throughout the works PJS design and installation team worked together in a fluid manner in order to react and adapt to the project as it evolved. The narrow time frame of the project meant that this fluidity was essential.

With over 90 gas points, and in excess of 60 laboratory sinks piped services throughout the building were extensive. Through good communication and coordination the installation integrated seamlessly with other building services. This was supported by creating an effective communication channel with the other Building Services engineers involved on the project.